Deb has undertaken making unique roman shades for the loft. It is theme based - 4 windows and 4 seasons, coincidence? I think not. She has the summer shade done - it really looks great. The other 3 should be done in 2 weeks. Note the awesome growler shelf:)
Monday, February 10, 2014
The bed
Well, it's closer to being done. The door knobs are waiting on Mexico. We will be looking for Mexican Talvera knobs. I'm still a bit bummed by the difference in the appearance of the wood on the different phases.
The Drawer side:
I still have the drawer fronts to make - it should be done in 2 weeks. As in the doors, the drawer pulls are waiting on Mexico - talvera pulls. The drawer fronts will be solid cherry.
The drawers have a unique design. As you pull them out the drawer does not tip down and can't be pulled out all the way. I couldn't see paying good money for drawer slides when I can do just as well.
The Drawer side:
I still have the drawer fronts to make - it should be done in 2 weeks. As in the doors, the drawer pulls are waiting on Mexico - talvera pulls. The drawer fronts will be solid cherry.
The drawers have a unique design. As you pull them out the drawer does not tip down and can't be pulled out all the way. I couldn't see paying good money for drawer slides when I can do just as well.
Subscribe to:
Posts (Atom)