Pages

Sunday, April 10, 2011

Stair Rails

John and Angie came up this weekend. John and I put up the loft rails and He sanded the loft floor. Deb will varnish it next weekend. Thank you John - the help was really needed this weekend. Just remember that there is still some Coors Light with your name on it in the fridge:)

The corner post:




These are the only 2 holes that had to be drilled to install the posts and rails. I obviously didn't drill straight.


The top post:






The bottom post:

No comments:

Post a Comment